Downtown Evergreen Economic District

and the Evergreen Legacy Fund – Dedicated to preserving the Legacy of Downtown Evergreen

Work Begins on Retaining Wall Downtown! December 17, 2013

Filed under: Press — downtownevergreen @ 7:04 pm

We are thrilled to report that CDOT has begun work on the retaining wall in Downtown Evergreen that was damaged by the September floods. We have been in contact with CDOT as well as the other stakeholders along Highway 74 regularly since the floods and have maintained a communication link between Downtown Evergreen and the agencies involved.

SAMSUNG CAMERA PICTURES

As of the last week, The portion of the wall that was lying in the creekbed has been removed and Bear Creek has been cleared of all of the debris from the wall failure. The next steps involved include repair of the utilities that were affected by the failure and subsequent scouring. Then a new retaining wall will be constructed to reinforce the embankment of the creek.

SAMSUNG CAMERA PICTURES

Advertisements
 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s