With permits in hand, we are thrilled to have finally scheduled the construction for the Lake trail connector to Downtown Evergreen! The full article, written by Sandy Barnes in last week’s Canyon Courier explains in more detail. The copy of that article is below and the article itself can be found here: http://www.canyoncourier.com/content/connector-trail-project-dam-scheduled-spring

Rendering with Wood Railings

By Sandy Barnes
Tuesday, November 11, 2014 at 1:40 pm

The Colorado Department of Transportation has granted the permit for the connector trail at the Evergreen Lake dam, and the project is now scheduled for spring 2015, said Dean Dalvit of the Downtown Evergreen Economic District.

“We reached out to the downtown merchants over the last few weeks,” Dalvit said, adding that the timing is designed to avoid the merchants’ busy season.

The overwhelming majority of business owners said they would like to see the project done in April, rather than in December, to keep from interfering with holiday shopping. During the project, several road closures will be necessary.

Goodland Construction, the Golden contractor selected for the project, has rearranged its schedule to accommodate the wishes of downtown Evergreen businesses, Dalvit said. The work could not be done January through March because of cold weather, he noted.

“This isn’t really considered a delay at this point because we could have taken the December window; but rather, it’s a matter of scheduling the construction for the best interests of our downtown Evergreen,” said Dalvit.

The construction will require one to three days of daytime full-road closures between the stoplight and Upper Bear Creek Road in the first week. The following week, there will be one to three nights of nighttime road closures. Some one-lane closures during the construction period will also be necessary.

Part of the traffic control plan includes signage in multiple locations, which will alert the community up to two weeks before the closures.

“Everyone will have plenty of advance notice to plan ahead for their commutes during those periods,” said Dalvit.

The 200-foot trail connection will provide an alternative to the steep metal stairs leading from the base of the dam to the lake trail.

The trail link construction is being funded with a $250,000 Great Outdoors Colorado grant and a $30,000 contribution from the Downtown Evergreen Economic District. In-kind donations, which include a design contributed by Dalvit, an architect with EV Studios, have made the long-awaited project possible.

The project has faced delays because of legal issues with the city of Denver, which owns the Lake Park property.

Before work on the trail could begin, the project design required approval from Denver. Also, Denver city attorneys requested a new agreement with EPRD to replace the existing one defining responsibilities and management of the Lake Park.

Other delays have been created by right-of-way issues, which have been resolved with CDOT. An additional complication was that the bid for the trail connection project came in at $257,000, higher than expected.

The original design has been modified to minimize environmental impacts on the area. When completed, the trail will touch the ground in only two places. Elevating the trail also reduced the cost of construction by minimizing the amount of excavation needed.

After Goodland Construction finishes the trail, handrails will be added along the sides for safety at an additional cost of approximately $10,000.

Contact Sandy Barnes at sandy@evergreenco.com.

Advertisements
 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s